House Construction Cost Calculator Pakistan (2026)

House Construction Cost Calculator Pakistan

Estimate the cost of building your house in Pakistan. Pick your plot size and finish level, then change the rate if your contractor quotes a different one. Free and easy.









Default rates are verified 2026 market rates: grey structure PKR 2,800–3,500, standard turnkey PKR 6,700–8,800, luxury PKR 10,000–15,000+ per sq ft. Change the rate to match your contractor’s quote.

A 5 Marla house (about 2,000 sq ft covered area) costs about PKR 1.30–1.52 crore at standard turnkey rates. A 10 Marla house (about 3,100 sq ft) costs about PKR 2.23–2.52 crore. A 1 Kanal house (about 5,900 sq ft) costs about PKR 4.13–4.73 crore. Grey structure alone is about PKR 2,800–3,500 per sq ft. Use the house construction cost calculator Pakistan above to change these numbers for your own plot.

House construction cost calculator Pakistan — bright yellow modern house exterior
A modern house exterior.

What does grey structure include?

Grey structure is the shell of the house: foundation, columns, beams, roof slabs, brick walls, stairs, plaster, and the hidden pipes and wires for electricity and plumbing. It does not include tiles, paint, doors, windows, kitchen, bathrooms or light fittings. In a standard house, grey structure is about 44% of the total cost.

What does finishing include?

Finishing turns the shell into a home: floor tiles or marble, wall paint, doors and windows, kitchen cabinets, bathroom fittings, electrical switches and lights, woodwork, false ceilings, and the outside look of the house. Finishing is about 56% of a standard house cost — and more than half on premium homes, because tiles, sanitary ware and kitchens can cost as much as you want to spend on them.

2026 construction rates we used

These are market ranges from Lahore builder guides published in September to November 2026. They are planning estimates, not quotes. Rates move with cement and steel prices, and DHA Lahore is about 6% higher than Lahore outside DHA.

Grey structure: PKR 2,800–3,500 per sq ft of covered area. Standard turnkey (complete house): PKR 6,700–8,800 per sq ft. Luxury turnkey: PKR 10,000–15,000+ per sq ft. Labour only (you buy the material): about PKR 450–850 per sq ft.

How to use the house construction cost calculator Pakistan

Enter your plot size and covered area in the house construction cost calculator Pakistan above, pick your finish level, then change the rate if your contractor quotes a different one. If you only know your plot in Marla, use our Marla to Sq Ft Converter first to work out the plot size.

FAQs

How much does it cost to build a 5 Marla house in Pakistan?

At standard turnkey rates in 2026, a 5 Marla double-storey house (about 2,000 sq ft covered area) costs about PKR 1.30–1.52 crore. Grey structure alone is about PKR 57.6–67.2 lakh. The exact cost depends on your design, material brands and city.

What is the grey structure rate per sq ft in Pakistan in 2026?

About PKR 2,800–3,500 per sq ft of covered area in Lahore, including material and labour. In DHA Islamabad, A+ grade grey structure is PKR 3,250–4,000 per sq ft.

How long does it take to build a house in Pakistan?

A 5 Marla house takes about 5 to 6 months, a 10 Marla house about 6 to 7 months, and a 1 Kanal house about 11 to 12 months — from site start to handover, at standard specification.

Does the estimate include the price of the plot?

No. The calculator covers construction cost only — grey structure plus finishing. Land, approval fees, basement and furniture are not included.

Why do rates differ from builder to builder?

Because no government body publishes an official construction rate. Every rate is a market estimate. The biggest differences come from material brands (local vs imported tiles, sanitary ware and kitchens), design complexity, and whether the quote includes finishing. Always ask for an item-wise BOQ against your drawings before you sign.

Sources

Rates on this page come from these 2026 market guides: ACCO — Construction Cost Per Sq Ft Pakistan 2026 (updated October 2026), Avenir Developments — House Construction in Lahore 2026 (September 2026), OpenHouse — Grey Structure vs Finished Cost Pakistan 2026, and DHA Builders — House Construction Cost in DHA Islamabad 2026 (November 2026). All figures are planning ranges, checked on 27 November 2026.